The Fire, Sept. 2009

by SeanGephardt 6. September 2009 12:54

I Just wanted to post again with the status of the house rebuilding from the March house fire we had, as we approach the six month marker. Tony & Team Alliance are busy cranking out the finals touches, and it really is starting to resemble a home. The hardwood floors and cabinetry are installed and look fantastic, and we are just anticipating the painting & trim being finished in the near future. The schedule is slated for an October first move in date, and we are only three short weeks away. Regardless of what the actual move in date is, I’m pretty sure the family and myself are going to be thrilled to live there again. After thinking hard and looking around the neighborhood, we set our mind on a cool blue-grey/slate color with white trim for the outside color. There really are just a few more items left on the schedule, and everyday another piece of the puzzle that is remodeling comes together.

As always, updated pictures are posted in the usual location.

Be the first to rate this post

  • Currently 0/5 Stars.
  • 1
  • 2
  • 3
  • 4
  • 5

Tags:

SG | The House

Powered by BlogEngine.NET 1.4.5.0
Theme by Mads Kristensen

About the artist

Sean Gephardt dreams digitally, and with a unique viewpoint, absorbs the synapses of the world.